Factory-direct steel can lower cost — if payment, freight, customs, and site logistics are planned as one package.
Buying structural steel directly from the fabricator can reduce the cost of a warehouse frame, but only when the import is managed as part of the construction programme rather than as a separate purchase.
Start with complete shop drawings and a member schedule. The fabricator needs them to produce columns, rafters, purlins, and connection plates that arrive ready to bolt together — and your site team needs the same schedule to plan erection.
Plan the payment and production timeline. A down payment typically starts fabrication; the balance is due before shipment. Align those milestones with your foundation works so steel does not sit idle on site — or foundations wait for steel.
Budget for everything after the factory gate: sea freight, port handling and storage, import duties and taxes, customs clearance, and trucking to site. Consolidating two projects in one shipment, as we have done, can reduce freight and handling cost per tonne.
Finally, prepare the site to receive and erect: laydown space, cranes, forklifts, and a delivery sequence that matches the erection plan. When these pieces are coordinated by one team, factory-direct steel delivers its savings without adding schedule risk.